Construction Updates

Complete

Night works will continue through to 24 September 2021, five nights a week. For safety reasons large exclusion zones are

Complete

George Street, between Charlotte and Margaret Streets will be closed to traffic in one or both directions, at night, for

Complete

Between Tuesday 14th and Wednesday 15th September 2021 underslung service works will be installed on the Neville Bonner Bridge deck

Complete

Over the weekend of Saturday 11 and Sunday 12 September 2021, out-of-hours works and a temporary traffic detour will be

Complete

On Thursday 9 September 2021 a concrete pour will occur on the Neville Bonner Bridge deck section that spans the

Complete

Revised dates: From Sunday 22 August 2021, nights work and temporary traffic detours will be required to upgrade stormwater connections

Complete

From 19 July 2021 for four weeks, night works will be required for removal of non-heritage material from the Printery

Complete

From 2 August 2021 for four weeks, works will be required for removal of non-heritage material from the Printery Building.

Complete

On Wednesday 28 and Thursday 29 July 2021 precast concrete will be installed on the Neville Bonner Bridge deck that

Complete

A significant section of the Neville Bonner Bridge will be lifted into position above the expressway requiring a weekend closure

Complete

A temporary gantry to be installed as a safety measure for when the bridge deck section is lifted in over

Complete

On Tuesday 15 June 2021 the first section of bridge will be installed from the South Bank abutment to a

Complete

Night works will continue through to Monday 31 May 2021, five nights a week. Night works are required to install

Complete

On intermittent nights to 31 May 2021 access to the CBD will be via Elizabeth St for southbound traffic on

Complete

On Saturday 29 May and Sunday 30 May 2021 a crane will be relocated within the Queen’s Wharf construction site.

Complete

Extended for an additional four nights, from 9pm Monday 17 May – the southbound lanes of the Riverside Expressway between

Complete

On select nights, over three weeks, starting 9pm Tuesday 27 April – the southbound lanes of the Riverside Expressway between

Complete

On Sunday 14 March 2021 access to the CBD will be via Elizabeth St for southbound traffic on the Riverside

Complete

Core samples of the ground conditions in Miller Park will be collected from 8 March until 11 March 2021. When:

Complete

Piling for the Neville Bonner Bridge supports will soon begin at the South Bank landing site and then move into